Shipment Update: Bulk Equipment Delivered for Oman Silicon Metal Project

Publish Time: 2026-04-23     Origin: Site

CHNZBTECH has recently completed the shipment of a batch of bulk equipment for a silicon metal project in Oman.

This delivery mainly includes electric motors, negative pressure conveying fans, main fan inlet components, as well as tapping, refining and casting fans. Electrical equipment such as incoming isolation cabinet and PT cabinet, outgoing cabinet, star-delta starter cabinet, and DC panels were also included.

In addition, silicone-coated filter cages with venturi tubes were shipped as part of the dust collection system, supporting stable operation under high-temperature and dusty conditions.

All equipment was checked and packed before shipment in accordance with export requirements.

This shipment marks another step in the execution of the Oman project, with subsequent deliveries to follow according to the overall schedule.

Backed by experience in silicon metal and ferroalloy projects, CHNZBTECH has built solid capabilities in supplying both main equipment and auxiliary systems, ensuring compatibility, reliability, and smooth integration at site.

The delivery once again highlights CHNZBTECH’s ability to support overseas projects with stable supply, consistent quality, and practical engineering solutions.

CHNZBTECH will continue to support the project in the next stages and maintain close communication with the client.

Product Inquiry

Precision in Every Piece: CHNZBTECH Ships Core Auxiliaries for Oman’s Silicon Metal Project

The Hidden Enemies of Industrial Silicon Furnace Efficiency—And How to Beat Them

Advancing Metallurgical Excellence: Vietnamese Delegation Visits CHNZBTECH in Xi’an

The Invisible Heartbeat: How CHNZBTECH Supercharges Submerged Arc Furnaces

CHNZBTECH Successfully Concludes Participation in ExpoAcero 2026 , Showcasing Its Strength in Metallurgical Equipment Solutions